
Framing
Scroll ↓

Scroll ↓
Collaborated with coworkers to read the building plans, level the sill plate (laser, water, spirit), sketch the layout, and assemble the framing.
Coordinated layout of studs, cripples, jacks and headers, then assembled the walls on the deck.
Applied string lines, tape measures, levels, and braces to establish plumb, level and square throughout the build.
Calculated the length of common rafters and sketched plum/level cuts. Notched the rafters and attached rakes to the lookouts.
Given slope and a model, developed a cut list, completed layout for common/hip rafters, and assembled.